Garry Reservoir, Water Main, and Booster Station Project

Liberty Lake, WA

Project

This project included design of a 250,000 gallon welded steel reservoir, approximately 3,500 linear feet of 8 inch ductile iron water main, and complete renovation of an existing booster station to replace the existing pumps, electrical controls, interior piping, and telemetry system. Century West designed and provided construction drawings and specifications to the District. Century West also provided bidding assistance and construction management services for the project.

Stay Up To Date

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.