Northport Reservoir & Water Treatment Project

Northport, WA

Project

Century West designed a 100,000-gallon water storage reservoir project to supplement the available storage for the City. Our design included a special foundation design to support the reservoir on fill material and a treatment system design consisting of green sand filtration to treat for high level of manganese. The project was constructed in the spring of 2020 and was funded through the CDBG program and a USDA-RD loan. Century West prepared funding applications for all environmental (SEPA and NEPA) documentation for the projects.