Home
//
Portfolio //Project
Tekoa Influent Lift Station Project
Tekoa, WA
Details
Influent Lift Station
State Funding
Project
Century West assisted the City of Tekoa in applying to DOE for funding to design and construct a new influent lift station for the City’s wastewater treatment plant. The existing lift station is at the end of its useful life and corrosion of the infrastructure is increasing the risk of a catastrophic failure. The siphon that carries all of the City’s sewage to the existing influent lift station also has an infiltration problem that significantly increases influent flows to the plant when creek flows increase. This project, currently in design, will replace the existing influent lift station with a new triplex lift station, using a new creek crossing that was installed during a previous infiltration and inflow project. Century West is currently designing the improvements with construction slated for summer 2021.

Airway Heights Correction Center Reclaimed Water Implementation

Washington Correctional Center Reclaimed Water Implementation

Wastewater Collection System & Treatment Facility Upgrades Design

Sherman Avenue Water & Wastewater Rehabilitation

Hayden H2 Lift Station Replacement Project

Sprague Lift Station Improvement Project

Davenport Wastewater Transmission and Disinfection Improvements

Airway Heights Recreation Center Utility Upgrades

Sandpoint Downtown Revitalization
Stay Up To Date
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.