The Port of Hood River is updating the Airport Master Plan for Ken Jernstedt Airfield in cooperation with the Federal Aviation Administration (FAA) to address the airport’s needs for the next twenty years. The Airport Master Plan will provide specific guidance in making the improvements necessary to maintain a safe and efficient airport that is economically, environmentally, and socially sustainable. The purpose of the Airport Master Plan is to define the current, short-term and long-term needs of the Airport through a comprehensive evaluation of facilities, conditions and FAA airport planning and design standards. The study will also address elements of local planning (land use, transportation, environmental, economic development, etc.) that have the potential of affecting the planning, development and operation of the airport.
Project Schedule
Airport User Survey
Planning Advisory Committee Meetings
Final Report
For more information, contact Century West Engineering at:
421 North Pearl Street #206, Ellensburg, WA 98926
509.933.2477 | 509.624.0355 (Fax)
Or by email at cweichbrodt@CenturyWest.com
Privacy Policy (800) 275-9957 Sitemap Copyright ©2018 Century West Engineering Corporation. All Rights Reserved.