Fosberg Road Drainage Improvements

Lake Oswego

Project

This project involves remedying an under-performing stormwater collection and conveyance system in Fosberg Road that routinely results in runoff, leaving the public right-of-way and affecting private property. Century West completed hydraulic modeling, including assessing existing basins adjacent to the project that contribute to the Fosberg/Carmen Drive stormwater network. In addition to the storm upgrades, Century West developed a modified mountable curb and gutter to replace existing asphalt berms, control run off, and avoid detrimental effects at the numerous steep driveways along this stretch of roadway.